It's been a while since my last post, but finally I can report that all ten of the baseboard frames are completed.
It has been a slow process because of existing commitments and the usual constraints, but I am glad to have arrived at this point. From now on I will be doing work that reflects the final shape of the model, rather than foundation work. So the next task will be to make and attach the risers on which the final baseboards will rest. I'll start at the back (the station) and work round the sides.
The baseboard frames are all detachable, and fix to the primary frame using bolts. Small lengths of batten on the primary frame act as guides to ensure that the baseboard frames sit where they should. For the time being I expect to exploit the ability to remove the baseboards from the primary frame, for example by doing some work in our garage rather than in the loft itself.
I've made a few tweaks to the layout design, particularly simplifying the sidings. This should help to making sure that the entire board is not swamped with track, thereby leaving space for scenery.
Somewhat worryingly, I have discovered a leak in the roof up by the chimney breast. When I went up to the loft on Saturday morning so start work, I found a puddle of water on top of some damp plywood sheets. I guess I should be grateful that the plywood was where it was, otherwise the effect could have been a lot worse. The leak is under control for now but it might require attention, and there's no doubt that that would hold up progress.
No comments:
Post a Comment