11 June 2009

Progress... but not entirely as we know it

I did make some more progress this weekend, although (for various reasons to do with faulty boilers and a car in need of a new door) not as much as I'd have liked.















The branch line now meets up with its access point to the storage sidings. I still have to add the track bed round to the station on B1; that will be the last piece of track bed construction that's required.

And so to the first fix. Below is a close-up of the junction between B1 and B2, showing the bolts that secure the top board to the frame. A lot more of this to come.














And here's an overview of the entire construction so far: